YINMIK PH Meter, Digital 4 in 1 PH EC TDS Temp Meter for Hydroponics
$31.99 Original price was: $31.99.$25.49Current price is: $25.49.
Description
Price: $31.99 - $25.49
(as of Apr 17, 2023 22:20:39 UTC – Details)
From the brand



YINMIK is a brand of instrument tester. With over 12 years of experience in instrument development and production. Focuse on
* Household Water Tester
* Hydroponic Nutrient Tester
* Food pH Meter
* Pool&Spa Water Tester
* Aquarium Water Tester
* Soil pH EC Moisture Tester


Hydroponic Nutrient Tester
Package Dimensions : 8.39 x 3.07 x 1.89 inches; 5.29 Ounces
Date First Available : September 19, 2022
Manufacturer : JiNan Huiquan Electronic Co., Ltd
ASIN : B0BFQ254XY
Country of Origin : China
{Easy to Calibrate:} Automatic pH calibration. Supports 3-point pH CAL at 7.00, 4.00, 10.01. Comes with 2 sets of pH meter calibration powders (4&7&10) for your calibration needs, (EC and tds meters are pre-calibrated).
{Multiple Uses:} Multiparameter Meters can test pH, EC, tds levels and temperature of pH up and down in hydroponics to know your water is in the perfect range for maximum nutrient uptake. Widely used in DWC hydroponics system, RO/DI water, drinking water, tap water, beer, wine, kombucha, milk, home brewing, pool, aquarium, reef tank, hot tub, aquaculture, Spas, fish tank and urine.
{Stable and Reliable Reading:} The additional chip makes the pH reading more stable (Reduce the interference of mobile phones and other items on the instrument), and the automatic temperature compensation (32 to 122 ℉) keeps the reading consistent.
{Easy to Read:} The large screen display with green Backlight helps to read the pH tds ec meter at odd angles and in low light. Press the {HOLD/TEMP} key to lock the reading, which helps to easily record readings.
Related products
-


YINMIK Digital pH Meter for Food, pH Probe for Sourdough and Bread Dough, Checking The pH of Fermenting Sausages and Salami, Waterproof pH Tester for Solid and Liquid Soft Soil Sample
$54.98Original price was: $54.98.$45.99Current price is: $45.99. Buy Now -


General Hydroponics pH Up Liquid Premium Buffering For pH Stability, 1-Gallon
$31.29 Buy Now -

Foxfarm Cultivation Nation PH Down – 1 Qt.
$27.60Original price was: $27.60.$21.74Current price is: $21.74. Buy Now -


MICROBE LIFE HYDROPONICS pH Up Liquid Premium Buffering for pH Stability, Increases pH Levels When Nutrient pH is too Low, 16oz
$11.35 Buy Now






